Skip to main content
Fig. 3 | BMC Medical Informatics and Decision Making

Fig. 3

From: Leveraging process mining for modeling progression trajectories in amyotrophic lateral sclerosis

Fig. 3

CFM graph built starting from M_0000. Each node reports the total number of patients passing through it (round brackets) and the min-median-max time, in days, needed to reach it from the root. Colors are graded on the median times, with intervals: <100, 101-200, 201-400, and >401 days. The edges report the percentage of patients passing through the child node with respect to the previous node (above) and the entire population (below). The graph has been thresholded for displaying only the pathways transitioned by at least 10 subjects

Back to article page