Skip to main content

Table 4 Comparison of information transfer speed between two groups of management modes across departments

From: Construction of exchange integrated information chain management model leading by information nurse for large instrument and equipment in operating room

Groups N The awareness rate of all staff in the equipment repair report (%) Maintenance crew arrival time (h)
Control group 63 11.11 (7/63) 24.31 ± 3.01
Observation group 41 95.12 (39/41) 18.24 ± 1.87
t/x2 71.06 15.02
p 0.000 0.000
\