Skip to main content

Table 12 The obtained solutions from the scenario 3 model

From: Resource management framework using simulation modeling and multi-objective optimization: a case study of a front-end department of a public hospital in Thailand

Case Optimization WCost WSat \(\lambda\) ZCost ZSat
1 Single obj 1 0 3943.5 14.97%
2   0 1 9174 90.62%
3 Multi-obj 0.8 0.2 1 4983 44.4%
4   0.6 0.4 1 5329.5 81.4%
5   0.5 0.5 1 6451.5 83.6%
6   0.4 0.6 1 6748.5 84.8%
7   0.2 0.8 1 7029 86.1%