Skip to main content

Table 11 The obtained solutions from the scenario 2 model

From: Resource management framework using simulation modeling and multi-objective optimization: a case study of a front-end department of a public hospital in Thailand

Case Optimization WCost WSat \(\lambda\) ZCost ZSat
1 Single obj 1 0 2161.5 31.2%
2   0 1 5940 89.9%
3 Multi-obj 0.8 0.2 1 2755.5 40.4%
4   0.6 0.4 1 3630 61.2%
5   0.5 0.5 1 3844.5 63.7%
6   0.4 0.6 1 4422 79.7%
7   0.2 0.8 1 5148 88.1%