Skip to main content

Table 4 Correlations between each construct pair

From: Renal transplant patient acceptance of a self-management support system

  PE-insight PE-time EE FC AF SE TR BI
Performance expectancy-insight 1.00 −0.02 0.19 −0.13 0.69a −0.02 0.64a 0.32a
Performance expectancy-time −0.02 1.00 0.13 0.47 0.20a 0.18 0.13 0.40a
Effort expectancy 0.19 0.13 1.00 0.01 0.30a −0.02 0.27 0.13
Facilitating conditions −0.13 0.47 0.01 1.00 0.12 0.57a −0.02 0.57
Affect 0.69a 0.20a 0.30a 0.12 1.00 0.35a 0.79a 0.51a
Self-efficacy −0.02 0.18 −0.02 0.57a 0.35a 1.00 0.15 0.37
Trust 0.64a 0.3 0.27 −0.02 0.79a 0.15 1.00 0.31a
  1. Note: athe 95% CI does not include 0